2841 Turner Rd. Auburn, ME 04210

Portfolio

SLIPLINING 96" EXISITING PIPE Greenville Me.
LightWeight Cellular Concrete maritime aquarium Norwalk, CT.
Installed aquatic life passage Direct Bury of 120’ of 10’ diameter CMP.
Light weight cellular concrete backfill in the annular space of a slip-liner.
Lined 614’ long CMP with 63” solid wall snap-tire liner. Grouted with lightweight cellular concrete.
Backfilling 360 yards of light weight cellular concrete for an EEL Farm. Waldoboro, ME
Sliplining existing 427’ long CMP. Backfilled the annular space with lightweight cellular concrete.
Sliplining 108’ of existing CMP with 76” tunnel liner. Meredith, NH