Description of work
An existing 67″ x 120″ corrugated metal open bottom arch culvert had large rust holes resulting in sink holes forming on Route 133 at the Parker River crossing.
The town’s engineer, Haley & Ward of Waltham, MA, determined that lining with HDPE polyethylene would be cost effective and would lessen the construction impact on the environmentally sensitive Parker River watershed.